Select your language

 

 

Bandar-e Deylam, Bushehr Province, Iran

  • LONG. 050 DEG. 09 MIN. 46.1 SEC EAST
  • LAT. 29 DEG. 43 MIN. 02.5 SEC NORTH
  • MOORING:(DOUBLE HAWSER) JOINT AT PORT BRACKET.
  • DEPARTURE DISPLACEMENT: 250,000 TONS.
  • MAX. SAILING DRAFT: 20 – 21 METERS.
  • MAX. L.O.A: 340 METERS.
  • ARRIVAL DRAFT: IN NORMAL BALLAST CONDITION
  • BERTHING OPERATION: BERTHING OPERATION WILL CARRY OUT ONLY FROM SUNRISE TO SUNSET, UNLESS TERMINAL’S EXCEPTIONAL DECISION
  • UN–BERTHING OPERATION : 24 HOURS
  • VESSELS MUST BE EQUIPPED WITH A MIDSHIPS PORT SIDE CARGO MANIFOLD THAT COMPLIES WITH THE OCIMF RECOMMENDATIONS FOR OIL TANKER MANIFOLDS AND ASSOCIATED EQUIPMENT
  • ONLY ONE 16" INCH FLEXIBLE FLOATING HOSE WILL BE CONNECTED TO THE SHIPS PORTSIDE MANIFOLD.
  • VESSELS MUST BE EQUIPPED WITH OPERATIONAL INERT GAS SYSTEM.